The Cauthen’s have removed the rotted window at the back of the church and replaced it with siding. The stained-glass window has been restored and reinstalled. Roy & Alex have built a trash box for outside the LSB kitchen. Jason Purvis has built lattice screens for the AC units behind the church, which are ready to be installed.
Work Projects Summer 2022
The Cauthen’s have removed the rotted window at the back of the church and replaced it with siding. The stained-glass window has been restored and reinstalled. Roy & Alex have built a trash box for outside the LSB kitchen. Jason Purvis has built lattice screens for the AC units behind the church, which are ready to be installed.
Previous
Previous
MVP Camp 2022
Next
Next